Zone 9 South Improvements (Sub-Bids to LaRiviere)

Base Bid: The project consists of the construction of a new 1.5 million gallon welded steel reservoir with site grading and overflow basin, approximately 1,700 LF of 18” ductile iron waterline, and approximately 4,200 LF of 12” PVC waterline within District property and existing rights of way along Day Mt. Spokane and E. Lowe Rd. All work shall be in accordance with the contract documents. Add Alternate #1 includes approximately 800 LF of 8” PVC waterline installed in existing rights of way along N. Howe Rd. All work shall be in accordance with the contract documents. Add Alternate #1 includes approximately 800 LF of 8” PVC waterline installed in existing rights of way along N. Howe Rd. All work shall be in accordance with the contract documents.

Status

Bidding Closed

Bid Date7/2/20 8:00 am

Company & Contacts

LaRiviere Inc

Scott Foster scott@lariviere.co   (208) 683-2646

Location

Mead, WA

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.