Native Salmonid Conservation Facility (Sub-Bids to LaRiviere)

This project consists of construction of the following single story aboveground structures: Administration Building, Pre-Engineered Metal Buildings (PEMB) (i.e. Shop/Storage Building, Westslope Cutthroat Salvage Building, Westslope Cutthroat Rearing Building), Water Treatment Building, Pumpback Station, 2 Residences, and Small Dwelling (temporary quarters). Other structures include a Creek Water Intake, a Spring Water collection system, a below-grade Water Control Box, below-grade Fire Suppression storage tanks, a covered Pollution Abatement Pond and a discharge structure. Construction of access roads, parking areas, stormwater facilities, and restoration of approximately 160 feet of Skookum Creek stream channel. Installation of septic system and potable drinking water system. Demolition includes removal of 2 decommissioned concrete septic tanks, a small concrete water control structure, decommissioning of up to 10 observation wells, and removal, handling and disposal of approximately 20 linear feet of buried 8-inch-diameter Transite (asbestos-cement) pipe.

Status

Accepting Bids

Bid Date6/22/21 12:00 pm

Company & Contacts

LaRiviere Inc

Scott Foster scott@lariviere.co   (208) 683-2646

Location

Usk, WA

Bidders may download electronic files at no cost. Printed documents are available, at Bidder’s expense, by choosing the “Order” option.