Hoffman Well Rehabilitation (Sub-Bids to LaRiviere)

This project consists of the construction and rehabilitation of the Hoffman Well, including vertical turbine line shaft pumps, motors, motor control centers, steel casing liner, concrete pedestal, 8”, 18” and 24” to 30” diameter piping, electrical, concrete vaults, excavation, site grading and restoration, structural modifications to well caisson, fencing, water and sewer connections, electrical and conduit work, and other related miscellaneous items.

Status

Accepting Bids

Company & Contacts

LaRiviere Inc

Tim McCormick tim@lariviere.co   (208) 683-2646

Location

Spokane, WA

Bidders may download electronic files at no cost. Printed documents are available, at Bidder’s expense, by choosing the “Order” option.