Public Jobs

SIA Business Park Roadway Improvements (Sub-Bids to LaRiviere)
LaRiviere Inc
Spokane
Includes widening and repaving S. Godfrey Blvd from W. Pilot Dr. to approximately 1,200 ft. to the north at which point it will intersect with a new road, W. Airlift Ave. which will be constructed starting from S. Godfrey Blvd. and ending at the intersection with S. Davison Blvd. The Work also includes adjusting existing utilities and installing new utilities as required within the limits of the project improvements. Utilities within the corridor include storm drainage, sanitary sewer, water, power, ITS, and telecomm franchise utilities.
Bidding Closed
4/27/21 2:00 am
ITD - EASTRIVER MP 10, 11, 11.2 (Sub-Bids to LaRiviere)
LaRiviere Inc
Bonner County
Repairing three landslides areas on Eastriver Rd in Bonner County at MP 10, 11, and 11.2 . Requires excavation, placement of structural fill, installation of drainage pipes, and landscaping.
Bidding Closed
4/7/21 2:00 pm
East Side Water Improvements Phase 3 (Sub-Bids to LaRivere)
LaRiviere Inc
Liberty Lake, WA
Construction of approximately 4,400 feet of 8” water main, including 61 service connections and all appurtenances as shown in these contract documents.
Bidding Closed
2/10/21 12:00 pm
2021 Open Trench Project (Sub-Bids to LaRiviere)
LaRiviere Inc
Coeur d'Alene, ID
The project generally consists of approximately 2,016 linear feet of 8-inch sanitary sewer main replacement, surface repair and other associated work.
Bidding Closed
1/27/21 9:00 am
Bigelow Gulch - Phase 3 (Sub-Bids to LaRiviere)
LaRiviere Inc
Spokane County, WA
This contract provides for the improvement of Bigelow Gulch Road in Section 25, Township 26 N., Range 43 E. & in Section 30, Township 26 N., Range 44 E., W.M. by clearing and grubbing, roadway excavation, embankment compaction, plain steel culvert pipe, catch basins, storm sewer pipe, crushed surfacing top course, cement treated base spreading, mixing, processing and shaping, hot mix asphalt, topsoil, seeding, fertilizing and mulching, erosion control, guardrail, pavement marking, signing, illumination system, traffic control, and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
Bidding Closed
12/2/20 9:00 am
CRP No. 3238 Separated Spokane River Centennial Trail at Carlson Road (Sub-Bids to LaRiviere)
LaRiviere Inc
Spokane County, WA
This contract provides for the improvement of the Centennial Trail located in Sections 6 and 7 in Township 26 N, Range 42 E.,W.M. by clearing and grubbing, roadway excavation, embankment compaction, culvert pipe, crushed surfacing top course, hot mix asphalt, silt fence, wattles, seeding and mulching, temporary traffic control, erosion control and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
Bidding Closed
12/2/20 10:00 am
CRP No. 3239 Frideger Road Bridge No. 4902/CRP No. 3245 Frideger Road (Sub-Bids to LaRiviere)
LaRiviere Inc
Spokane County, WA
County Road Project No. 3239: The work provides for the improvements of Frideger Road Bridge No. 4902 located in Section 4, Township 29 N, Range 44 E.W.M., followed by the removal of the existing bridge and the construction of a new structure over Little Spokane River. The new concrete bridge is a single span framed with precast-prestressed girders and is supported by steel pile at each end. Included are; bridge removal, structure excavation, structure surveying, steel piling, cone. CL 4000 for bridge, steel reinf. bar for bridge, superstructure, dust control on detour, beam guardrail, concrete barrier and other work all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specification. County Road Project No. 3245: The work provides for the improvements of Frideger Road Bridge No. 4902 located in Section 4, Township 29 N, Range 44 E.W.M., by removal of the existing roadway and widening with the construction of the new roadway. Project limits extend along Frideger Road with CRP-3245, adjoining CRP-3239 (bridge) at each end, starting 350 feet north of the bridge and ending 1/2 mile south of the bridge. Included are; clearing and grubbing, roadway excavation, embankment compaction, gravel borrow, beam guardrail, HMA, CSBC, dust control maintenance on the detour, and other work all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specification.
South Gorge Trail Phase 2 & CSO 22 B Separation Projects (Sub-Bids to LaRiviere)
LaRiviere Inc
Spokane, WA
This project consists of the construction of approximately 5,600 cubic yards of excavation and embankment, 6,000 linear feet of storm, sanitary and clean water piping, 3,900 linear feet of waterline, 3,500 square yards of storm swale construction, of waterline, 110 drainage structures, 9,000 square yards of 5-inch thick HMA pavement, 3,500 square yards of 3-inch thick HMA pavement, 4,500 square yards of 2-inch thick HMA trail pavement, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
7/2/20 8:00 am
Zone 9 South Improvements (Sub-Bids to LaRiviere)
LaRiviere Inc
Mead, WA
Base Bid: The project consists of the construction of a new 1.5 million gallon welded steel reservoir with site grading and overflow basin, approximately 1,700 LF of 18” ductile iron waterline, and approximately 4,200 LF of 12” PVC waterline within District property and existing rights of way along Day Mt. Spokane and E. Lowe Rd. All work shall be in accordance with the contract documents. Add Alternate #1 includes approximately 800 LF of 8” PVC waterline installed in existing rights of way along N. Howe Rd. All work shall be in accordance with the contract documents. Add Alternate #1 includes approximately 800 LF of 8” PVC waterline installed in existing rights of way along N. Howe Rd. All work shall be in accordance with the contract documents.
Hamilton Street Corridor Intersection Improvements (Sub-Bids to LaRiviere)
LaRiviere Inc
Spokane, WA
This project consists of the construction of approximately six traffic control signals, 5800 linear feet of directional boring, fiber optic cable and splicing, 7 catch basins, 5170 square yards of HMA pavement repair 3 inches thick, 9080 square yards of HMA pavement 2 inches thick, 1700 linear feet of curb or curb and gutter, 1400 square yards of sidewalk, 1700 linear feet of reinforced concrete curb, and 380 square yards of traffic island, signing, pavement markings, sundry utility adjustments, and other related miscellaneous items.